Examines the emergency preparedness for and response to the August 1, 2007 bridge collapse in Minneapolis, Minnesota that killed 13 people and injured 121 other
In the early afternoon, construction equipment and construction aggregates (sand and gravel for making concrete) were delivered and positioned in the two closed
About 6:05 p.m. central daylight time on Wednesday, August 1, 2007, the eight-lane, 1,907-foot-long I-35W highway bridge over the Mississippi River in Minneapol