Gold Line Phase II Pasadena to Montclair - Foothill Extension 2A

Gold Line Phase II Pasadena to Montclair - Foothill Extension 2A
Author :
Publisher :
Total Pages : 323
Release :
ISBN-10 : OCLC:1031033960
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis Gold Line Phase II Pasadena to Montclair - Foothill Extension 2A by : Metro Gold Line Foothill Extension Construction Authority

Download or read book Gold Line Phase II Pasadena to Montclair - Foothill Extension 2A written by Metro Gold Line Foothill Extension Construction Authority and published by . This book was released on 2010 with total page 323 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Metro Gold Line Foothill Extension Construction Authority (the “Authority”) previously prepared a Draft Environmental Impact Statement/Environmental Impact Report (Draft EIS/EIR) for the Gold Line Foothill Extension Project (the “Project”). The Gold Line Foothill Extension is referred to as Phase 2 of the overall Gold Line Foothill Extension Project and, at complete build out, would span from the cities of Pasadena to Montclair. The Foothill Extension Project was divided into two subsequent phases: Phase 2A, spanning from Pasadena to Azusa, and Phase 2B, spanning from Azusa to Montclair. In conjunction with Authority’s decision to proceed with Phase 2A, a Final EIR was prepared based on the Draft EIS/EIR and was certified in 2007, though only for the purposes of extension’s Phase 2A. Because no federal action or funding is involved in Phase 2A, no NEPA action is required. The portion of the Phase 2A from Pasadena to Azusa includes 11.5 miles of track through six cities (Pasadena, Arcadia, Monrovia, Duarte, Irwindale, and Azusa), six stations, and the construction of a new Maintenance and Operation Facility (M&O Facility).


Gold Line Phase II Pasadena to Montclair - Foothill Extension 2A Related Books

Gold Line Phase II Pasadena to Montclair - Foothill Extension 2A
Language: en
Pages: 323
Authors: Metro Gold Line Foothill Extension Construction Authority
Categories: Environmental impact statements
Type: BOOK - Published: 2010 - Publisher:

DOWNLOAD EBOOK

The Metro Gold Line Foothill Extension Construction Authority (the “Authority”) previously prepared a Draft Environmental Impact Statement/Environmental Imp
Gold Line Phase II, Pasadena to Montclair, Los Angeles and San Bernardino Counties
Language: en
Pages: 250
Gold Line Phase II
Language: en
Pages:
Authors: United States. Department of Transportation
Categories: Local transit
Type: BOOK - Published: 2004 - Publisher:

DOWNLOAD EBOOK

Metro Gold Line Foothill Extension--Azusa to Montclair
Language: en
Pages:
Authors: Metro Gold Line Foothill Extension Construction Authority
Categories: Azusa (Calif.)
Type: BOOK - Published: 2013 - Publisher:

DOWNLOAD EBOOK

The Metro Gold Line Foothill Extension from Azusa to Montclair is the second and final phase of the Foothill Extension. It expands the Gold Line alignment 12.3
Gold Line Foothill Extension, Pasadena to Montclair Final Environmental Impact Report
Language: en
Pages:
Authors: Los Angeles to Pasadena Metro Blue Line Construction Authority
Categories: Environmental impact statements
Type: BOOK - Published: 2007 - Publisher:

DOWNLOAD EBOOK

This final environmental impact report (FEIR) describes and summarizes the transportation impacts, environmental impacts, and costs for the Gold Line Foothill E